Products & Services

Complete pre-engineered steel building packages for the Philippines: the main frame, floors, cladding and paint, designed to NSCP 2015, made in SEICO Group's factories and installed by our local team.

From the first drawing to the last roof panel

PEB Philippines brings SEICO Group's steel structures and pre-engineered steel buildings to the Philippines, for factories, warehouses, logistics centers, commercial buildings and infrastructure. We supply more than the frame: floor decking, roof and wall cladding and industrial paint all come through the same team, so one partner is responsible for the whole building, from design and fabrication to importation, delivery and installation.

SEICO Group's five factories in Hai Phong, Vietnam supply more than 60,000 tons of steel structure and 2 million m² of roof and wall panels every year, backed by management systems certified to ISO 9001, ISO 14001 and ISO 45001.

  • Designed to NSCP 2015 and reviewed by a Filipino structural engineer
  • QA/QC engineers check every stage of fabrication
  • Installed by DELTA Group's PCAB-licensed crews
Aerial view of a large steel factory complex built by SEICO

Less steel, smaller foundations, faster on site

How a pre-engineered building compares with a conventional steel building.

  • Steel portal frames of the APC Cowbarn in Claveria, Misamis Oriental 15–40%

    Lighter main frame

    High-strength steel and tapered sections cut the quantity of columns and rafters.

  • Roof purlins on a steel frame at the Coca-Cola project 15–30%

    Lighter secondary frame

    High-strength cold-formed purlins and girts reduce the secondary steel.

  • Aerial view of the column footings at the Villongco Warehouse site in Parañaque

    Smaller foundations

    A lighter structure with longer bay spacing puts less force on the foundations, so fewer are needed.

  • Steel members with pre-punched bolt holes laid out on a construction site

    Bolted, not welded

    Members arrive cut to size and bolt together on site with no welding, which keeps erection fast and clean.

Pre-engineered vs conventional construction

Compared onPre-engineered buildingConventional building
Delivery timelineShorter time on siteLonger, because members are fabricated on site
ErectionEasy, quick and safeLabor-intensive
Seismic resistanceLightweight, flexible membersHeavy, rigid members
Fit and performanceExact fit, optimal efficiency and performanceDesigned to adapt to possible future uses
AccountabilitySingle-source responsibilityMultiple vendors involved
Overall costUp to 30% lower, thanks to a streamlined process and materialsHigher, because of more labor and time

Source: DELTA Group company profile, 2026.

Good to know

Savings
Up to 30% for single-story and 20% for multi-level buildings, compared with conventional construction
Lead time
About 60 to 75 days for design and delivery from payment, with timely approval of the drawings
Installation
About 4 to 6 weeks per 1,000 m² once the foundation is ready
Minimum order
800 m² of floor area or 26 tons of steel
Structural design
Seismic and wind loads to NSCP 2015 for the exact location; low- to mid-rise buildings, with complex designs on consultation
Warranty
On structural integrity and workmanship, with the terms set in the contract

More than 20 years of steel building, now close to home

  • 20+Years of steel building experience
  • 0+SEICO Group employees
  • 0+Projects worldwide
  • 0+Projects in the Philippines

Built with SEICO Group steel

From Ho Chi Minh City's first metro line to factories for global names such as Foxconn, VinFast and GreenFeed, SEICO steel stands in more than 2,000 projects across Southeast Asia and beyond.

View all projects
Metro Line No. 1, Ben Thanh - Suoi Tien Metro Line No. 1, Ben Thanh - Suoi TienHo Chi Minh City · 2022
Nitto Denko Vietnam Factory Nitto Denko Vietnam FactoryVSIP Binh Duong Industrial Park · 2023
Heller-VinFast Heller-VinFastVietnam · 2019
Chadwick International School in Vietnam Chadwick International SchoolEcopark, Hung Yen · 2021
Damen Shipyard Damen ShipyardThuy Nguyen, Hai Phong · 2013
GreenFeed Hung Yen Factory GreenFeed Hung Yen FactoryPho Noi Industrial Park, Hung Yen · 2013

In the Philippines: PEB Philippines and DELTA Group have supplied SEICO steel to more than 50 projects, from showrooms and warehouses to schools, hangars and processing plants. With offices in Quezon City and Pasig City, we bring the same engineering and factory quality closer to Filipino investors, developers and contractors.

See projects in the Philippines

Have a project in mind?

Tell us about your site, size and schedule, and our engineers will recommend a suitable steel building solution.