From the first drawing to the last roof panel
PEB Philippines brings SEICO Group's steel structures and pre-engineered steel buildings to the Philippines, for factories, warehouses, logistics centers, commercial buildings and infrastructure. We supply more than the frame: floor decking, roof and wall cladding and industrial paint all come through the same team, so one partner is responsible for the whole building, from design and fabrication to importation, delivery and installation.
SEICO Group's five factories in Hai Phong, Vietnam supply more than 60,000 tons of steel structure and 2 million m² of roof and wall panels every year, backed by management systems certified to ISO 9001, ISO 14001 and ISO 45001.
- Designed to NSCP 2015 and reviewed by a Filipino structural engineer
- QA/QC engineers check every stage of fabrication
- Installed by DELTA Group's PCAB-licensed crews
Our products
Choose a product to see specifications, applications and photos.
One team, from the first drawing to the last bolt
One team takes your building from design through to handover.
- 01 Design Filipino engineers set the design parameters to NSCP 2015, SEICO Group's engineers model and analyze the building, and a Filipino structural engineer reviews the design. Learn more
- 02 Manufacturing Every member is made in SEICO Group's own factories in Vietnam, with materials tested and each stage checked by QA/QC engineers. Learn more
- 03 Installation DELTA Group's PCAB-licensed crews and supervising engineers erect the building on site exactly to the design, from columns to cladding. Learn more
Less steel, smaller foundations, faster on site
How a pre-engineered building compares with a conventional steel building.
-
15–40%
Lighter main frame
High-strength steel and tapered sections cut the quantity of columns and rafters.
-
15–30%
Lighter secondary frame
High-strength cold-formed purlins and girts reduce the secondary steel.
-
Smaller foundations
A lighter structure with longer bay spacing puts less force on the foundations, so fewer are needed.
-
Bolted, not welded
Members arrive cut to size and bolt together on site with no welding, which keeps erection fast and clean.
Pre-engineered vs conventional construction
| Compared on | Pre-engineered building | Conventional building |
|---|---|---|
| Delivery timeline | Shorter time on site | Longer, because members are fabricated on site |
| Erection | Easy, quick and safe | Labor-intensive |
| Seismic resistance | Lightweight, flexible members | Heavy, rigid members |
| Fit and performance | Exact fit, optimal efficiency and performance | Designed to adapt to possible future uses |
| Accountability | Single-source responsibility | Multiple vendors involved |
| Overall cost | Up to 30% lower, thanks to a streamlined process and materials | Higher, because of more labor and time |
Source: DELTA Group company profile, 2026.
Good to know
- Savings
- Up to 30% for single-story and 20% for multi-level buildings, compared with conventional construction
- Lead time
- About 60 to 75 days for design and delivery from payment, with timely approval of the drawings
- Installation
- About 4 to 6 weeks per 1,000 m² once the foundation is ready
- Minimum order
- 800 m² of floor area or 26 tons of steel
- Structural design
- Seismic and wind loads to NSCP 2015 for the exact location; low- to mid-rise buildings, with complex designs on consultation
- Warranty
- On structural integrity and workmanship, with the terms set in the contract
More than 20 years of steel building, now close to home
- 20+Years of steel building experience
- 0+SEICO Group employees
- 0+Projects worldwide
- 0+Projects in the Philippines
Built with SEICO Group steel
From Ho Chi Minh City's first metro line to factories for global names such as Foxconn, VinFast and GreenFeed, SEICO steel stands in more than 2,000 projects across Southeast Asia and beyond.
View all projects
Metro Line No. 1, Ben Thanh - Suoi Tien
Nitto Denko Vietnam Factory
Heller-VinFast
Chadwick International School
Damen Shipyard
GreenFeed Hung Yen Factory
In the Philippines: PEB Philippines and DELTA Group have supplied SEICO steel to more than 50 projects, from showrooms and warehouses to schools, hangars and processing plants. With offices in Quezon City and Pasig City, we bring the same engineering and factory quality closer to Filipino investors, developers and contractors.
See projects in the PhilippinesHave a project in mind?
Tell us about your site, size and schedule, and our engineers will recommend a suitable steel building solution.
